Since the last post things have moved on slowly but surely though very heavy rain has prevented too much progress.

The road to the bottom field is complete apart from the top layer of gravel, as is the access road for the middle pitches. We had hoped to get these middle pitches resown and planted but we will have to wait for the soil to dry out before we can attempt any work on them.

The builder timed the cement lorries perfectly for last Wednesday morning and the swimming pool terrace was laid in perfect conditions before the rain started again.
The finished base is looking really good and we can appreciate the size of it all now.
Once the tiles are on (a few weeks for the cement to dry first) it will look superb.

The filters, pumps etc. are to be installed from tomorrow so we are nearly there!

The base for the new bin store beside the entrance was poured and levelled at the same time so we now have to organise the sides for that.

The windows are due to be put in the extension this coming week so that work can then begin on the inside of that and we will actually be able to use it sometime in the not too distant future!